EnergyBeira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Basic and detailed earthworks, drainage and paving design for the permanent access to the plant from the BR-230.

Permanent access to the Belo Monte hydropower plant from the BR-230 highway, 1.17 km long, between Altamira and Anapu, Pará.
G5 developed the basic and detailed earthworks, drainage and paving design, completed in March 2020. Belo Monte is also among the works instrumented with GEOKON equipment supplied by the group.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.