Belo Monte HPP permanent access road

Basic and detailed earthworks, drainage and paving design for the permanent access to the plant from the BR-230.

Location
Altamira and Anapu, PA, Brazil
Year
2020
Category
Transport
Satellite image with the alignment of the permanent access to Belo Monte and the junction ramps with the BR-230.

Permanent access to the Belo Monte hydropower plant from the BR-230 highway, 1.17 km long, between Altamira and Anapu, Pará.

G5 developed the basic and detailed earthworks, drainage and paving design, completed in March 2020. Belo Monte is also among the works instrumented with GEOKON equipment supplied by the group.