EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Three-dimensional modelling with stability and stress-strain analysis of a 100 m tailings dam.

Earthfill tailings dam with a maximum height of 100 m and a total reservoir volume of 2.86 hm³.
G5 developed the three-dimensional model of the structure, with stability and stress-strain analysis, completed in October 2021.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.