EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Special safety inspection of a 37 m homogeneous earthfill dam, for Compesa, in Pernambuco.

Homogeneous earthfill dam with a maximum height of 37 m, in Cabo de Santo Agostinho, Pernambuco. The 10,000-year return period flow is 2,121 m³/s.
G5 carried out the special safety inspection of the structure, completed in August 2025.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.