EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Geotechnical, structural and geodetic consulting on the structures of a 50 m RCC dam, for Saneago.

Roller-compacted concrete (RCC) dam with a maximum height of 50 m and a 129 hm³ reservoir, in Goiânia.
G5 provided geotechnical, structural and geodetic consulting on the dam structures, completed in August 2025.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.