EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Design of a 14 km headrace tunnel in the Chilean Andes, the largest underground work in the G5 portfolio.

El Volcán headrace tunnel, 14,128 m long with a 4.34 m by 4.38 m section, in San José de Maipo, Chile.
The design was completed in November 2019 and is the largest underground work in the G5 portfolio outside Brazil.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.