Skip to content
Underground works

Alto Maipo: El Volcán headrace tunnel

Design of a 14 km headrace tunnel in the Chilean Andes, the largest underground work in the G5 portfolio.

Location
San José de Maipo, Chile
Year
2019
Category
Underground works
Portal of the El Volcán headrace tunnel at Alto Maipo, with the crew and service track at the excavation face.

El Volcán headrace tunnel, 14,128 m long with a 4.34 m by 4.38 m section, in San José de Maipo, Chile.

The design was completed in November 2019 and is the largest underground work in the G5 portfolio outside Brazil.

Let us talk about your project

Tell us the technical challenge and we will come back with the right team to assess it.

Get in touch