EnergyBeira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Alternatives study and basic and detailed design of the permanent water intake system for the Ibema mill, on the Marrecas river.

Permanent water intake system for the Ibema mill on the Marrecas river, in Turvo, Paraná, with an average flow of 55.56 l/s (200 m³/h) and a peak flow of 111 l/s (400 m³/h).
G5 carried out the alternatives study and the basic and detailed design of the system, completed in April 2020. The work is also part of the group's construction management portfolio.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.