Sanitation

Ibema mill water treatment plant

Alternatives study and basic and detailed design of the permanent water intake system for the Ibema mill, on the Marrecas river.

Location
Turvo, PR, Brazil
Year
2020
Category
Sanitation
Client
Ibema
Bank of the Marrecas river at the Ibema mill intake site, with the gabion wall over the rock outcrop.

Permanent water intake system for the Ibema mill on the Marrecas river, in Turvo, Paraná, with an average flow of 55.56 l/s (200 m³/h) and a peak flow of 111 l/s (400 m³/h).

G5 carried out the alternatives study and the basic and detailed design of the system, completed in April 2020. The work is also part of the group's construction management portfolio.