Skip to content
Sanitation

Belém wastewater treatment plant: expansion

Geotechnical and structural studies for the expansion of a Sanepar wastewater treatment plant in Curitiba.

Location
Curitiba, PR, Brazil
Year
2019
Category
Sanitation
Client
Sanepar
Engineers follow the excavation on the Belém plant expansion site, with a backhoe in the background.

Sanepar wastewater treatment plant in Curitiba, with a peak flow of 2,520 l/s.

G5 prepared the geotechnical and structural studies for the plant expansion, completed in September 2019.

Let us talk about your project

Tell us the technical challenge and we will come back with the right team to assess it.

Get in touch