EnergyBeira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Instrumentation and automation design, with automated water level indicators and inclinometers, at Klabin's Puma II unit.

Geotechnical instrumentation at Klabin's Puma II unit, in Paraná: 14 water level indicators automated with electric piezometers and 3 in-place inclinometers.
G5 developed the instrumentation and automation designs, with dataloggers, radios and a remote monitoring system.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.