Owner's engineering and full construction management of about 67 km of 138 kV transmission line between Guarapuava and Turvo.

Location
Guarapuava and Turvo, PR, Brazil
Category
Transmission
Transmission tower seen from below against a cloudy sky, with a lineworker climbing the structure.

138 kV transmission line between Vila Carli and Ibema/Faxinal, about 67 km long, between Guarapuava and Turvo, Paraná.

G5 provided owner's engineering and full construction management, with supervision, inspection and interface with the utility.