EnergyBeira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Periodic safety review and emergency action plan for a concrete dam in central-western Paraná.

Small hydropower plant with 29 MW of installed capacity, classified as Class C (low risk, medium associated potential damage).
The dam is a concrete structure with a maximum height of 7.00 m and a 1.6 hm³ reservoir. The 10,000-year return period flow is 9,970 m³/s and the spillway design flow is 8,270 m³/s. Completed in May 2019.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.