EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Macro-drainage study for the BR-324 urban crossing in Amélia Rodrigues, for Via Bahia.

Urban crossing of the BR-324 highway in Amélia Rodrigues, Bahia, between km 542 and 543.
G5 prepared the macro-drainage study for the stretch for Via Bahia, completed in May 2024.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.