EnergyJaguariaíva, PR, Brazil
Beira Rio SHP
Full construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
Macro-drainage study for the BR-116 urban crossing in Vitória da Conquista, for Via Bahia.

Urban crossing of the BR-116 highway in Vitória da Conquista, Bahia, around km 15.
G5 prepared the macro-drainage study for the stretch for Via Bahia, completed in August 2024.
EnergyFull construction management and owner's engineering on an 18 MW small hydropower plant in northern Paraná.
EnergyFull construction management and owner's engineering on a 26 MW small hydropower plant in north-western Minas Gerais.
EnergyFull construction management and owner's engineering on a 14 MW small hydropower plant in Goiás.
Tell us the technical challenge and we will come back with the right team to assess it.