Skip to content
Underground works

Fundão HPP: headrace tunnel rehabilitation

Design and on-site technical support for rehabilitation of the headrace tunnel of a 120 MW hydropower plant.

Location
Guarapuava, PR, Brazil
Year
2021
Category
Underground works
Inside the Fundão headrace tunnel during rehabilitation works, with the crew and support equipment at the work face.

Hydropower plant with 120 MW of installed capacity in Guarapuava, Paraná.

G5 was responsible for the design and on-site technical support of the headrace tunnel rehabilitation, an intervention in an existing underground structure, with the plant offline and a critical return-to-service deadline. Fundão is also among the works instrumented with GEOKON equipment.

Let us talk about your project

Tell us the technical challenge and we will come back with the right team to assess it.

Get in touch