Skip to content
Dam safety

CBA plants: Emergency Action Plans

Review, publication and training for the Emergency Action Plans of three CBA hydropower plants in São Paulo State.

Location
São Paulo State, Brazil
Category
Dam safety
Client
CBA
Concrete structure at one of the CBA plants, with the gate to the left and the reservoir behind.

Three CBA plants in São Paulo State: Piraju HPP, with 80 MW, Barra HPP, with 40 MW, and Fumaça SHP, with 36 MW of installed capacity.

G5 is responsible for reviewing, publishing and training on the Emergency Action Plans of the three plants. Work in progress.

Let us talk about your project

Tell us the technical challenge and we will come back with the right team to assess it.

Get in touch